1 |
Chief-Engineer (PWD), NH, Nagaland |
Wokha, Nagaland |
Widening of existing single/intermediate lane road to 2 lane road from Km 83.00 to Km 101.00 on NH-61 in the state of Nagaland |
INR 1534.5 mn |
INR 1423 mn |
2 |
Engineer-In-Chief (R&B;), NH, CRF,LWF,PPP & Bidgs,Telangana |
Mahabubnagar, Telanagana |
Widening and Strengthening/Reconstruction of existing pavement to Four lanes with paved shoulders from Km 266.348 to Km 283.000 of Mahabubnagar - Jadcherla section of NH-167 on EPC mode in the state of Telangana. |
INR 1710.00 mn |
INR 1312.5 mn |
3 |
Superintending Engineer (R&B;), Headquarters circle |
NAC, Hyderabad |
A. Construction of Second Floor in PG Block at NAC, Hyderabad, B.Construction of First Floor of Placement Block (6850 Sft) at NAC,
Hyderabad, C. Improvements to Audio Visual system of NAC auditorium, Atrium area, Dining Hall and Wash rooms etc., at NAC Campus, Hyderabad, D. Providing Electrical Installation, Air Conditioning of Seminar Halls, Computer lab and one passenger lift at NAC Campus, Hyderabad |
INR 70.26 mn |
INR 0.00 mn |
4 |
The Chief Engineer (R&B;), National Highways & CRF, Vijayawada |
Mudigubba |
Widening of Existing Road to Two lane with paved shoulder from Km 0+000 to Km 32+000 (Mudigubba to Puttaparthi) of NH-342 in the State of Andhra Pradesh through Engineering, procurement & Construction (EPC) basis under Annual Plan 2021-22 |
INR 2023.4 mn |
INR 0.00 mn |
5 |
MD-NHIDCL |
Dulte, Mizoram |
Rehabilitation and Upgradation of 2-Lane paved shoulders of Rulchawm-Dulte section (Economic Corridor) of NH-6 from Existing Chainage Km 50+360 (Rulchawm) to Km 69+015 (Dulte) Design Chainage Km 45+040 to Km 62+200) (Pack-IV) in the State of Mizoram under Bharatmala Pariyojana on EPC |
INR 1854.8 mn |
INR 1506.9 mn |